Occupancy certificate and CC: what to check before you pay

Written by Raj Rawthar
Last updated 29 Oct 2026 · 13 min read

In short

  • The CC (commencement certificate) is your council's permission to start building. The OC (occupancy certificate) is the same office saying the finished building is safe and legal to live in.
  • Getting the OC is the builder's job, not yours: Section 11(4)(b) of the RERA Act 2016. Once it's out, Section 19(10) gives you two months to take the keys.
  • Without an OC you stay on a temporary water line. In the Samruddhi case the Supreme Court recorded property tax 25% above normal and water charges 50% above.
  • Who signs it depends on who gave the CC: CIDCO in Kharghar and Taloja, Panvel Municipal Corporation in Panvel, NMMC from Vashi to Airoli. The letterhead names the office.
  • No OC, no last payment and no shifting date. Ask for it by name in writing, then confirm the number and date with the office that signed it.
In this post
  1. CC lets them build. The OC lets you live there.
  2. Four papers, in the order they reach you
  3. What a missing OC costs you every month
  4. Who signs the OC in your own area
  5. Five checks you can finish this week

The builder’s office has sent you a letter. The keys are nearly ready, it says, and so is the last payment. You mention it at work, and somebody says one thing back: check the OC, the paper that lets you live there.

You look it up. One page says CC means completion certificate. The next says commencement. A third is busy selling flats. And under all of it sits the worry you don’t say out loud: what if we pay in full, shift the furniture in, and the flat turns out not to be legal?

I’ll do this the way I’d do it for my own family. Two papers, in plain words. Who signs them here in Navi Mumbai. What a missing one costs you every month. Then five checks you can finish this week from your phone.

Three kinds of reader land here. Is your last payment still pending? Then all of it is for you. Keys already yours, and no OC? Start at what it costs you every month. Buying a resale flat? The OC is what your own lender asks for first.

CC lets them build. The OC lets you live there.

The CC (the commencement certificate, your council’s written permission to start building) comes first. The OC (the occupancy certificate, the same office saying the finished building is safe and legal to live in) comes last. Getting both is the builder’s job. Yours is to see them before your money leaves your account.

Think of a bus. The OC is its fitness certificate. Nobody asks for it on an ordinary day. The day something goes wrong, it’s the only paper anyone wants to see.

The law agrees, and it puts the work on them. The RERA Act 2016 (the central law that protects home buyers) is blunt about it. Section 11(4)(b) makes the builder responsible for getting the certificate and handing it to you. Maharashtra’s older flats law, MOFA 1963, asks the same before they give up the flat.

Then a clock starts on your side. Section 19(10) gives you two months to take the keys once the OC is out. So the OC isn’t the end of the paperwork. It’s the signal to move.

Four papers, in the order they reach you

Four papers sit between an empty plot and your name on the society list. They come in a fixed order. Each one proves a different thing.

The paperWho signs itWhen it comesWhat it proves to you
Commencement certificate (CC)The planning authority: CIDCO, NMMC, Panvel Municipal Corporation or KDMC (Kalyan-Dombivli’s)Before the first brickThe plan was sanctioned, and work is legal. It also says how many floors
Building completion certificateYour builder’s own architect or engineerWhen the work is finishedThe architect’s word that the building matches the sanctioned plan. Not the authority’s word
Occupancy certificate (OC)The planning authority, after its own checkWithin 21 days of that filingThe building is safe and legal to live in
Part occupancy certificateThe same authorityBefore the whole site is doneOne wing, or a set of floors, is cleared. Read exactly which

Along the way your builder will offer possession (the day the keys and the flat become yours to use). A letter offering it is not an OC. Only the office that gave the CC can give you that.

Those timings aren’t a builder’s promise either. They sit in the state’s own building rules, the UDCPR 2020. The architect files the completion certificate, the office then gets 21 days to decide on the OC, and a part OC is allowed before the whole site is done.

One more thing hides inside that 21-day rule. If those 21 days pass with no answer, the rule treats the work as approved for living in. So silence from the office isn’t a refusal. Ask the desk what it actually recorded.

After the OC, one more handover is owed to you. The land and the building must pass from the builder to your society. The law calls that conveyance. Where no local rule says otherwise, Section 17 gives them three months from the OC. The plans are due to you within thirty days.

What a missing OC costs you every month

A missing OC rarely ends in a bulldozer. It ends in a bill, and the bill repeats. No brochure carries this part.

The Supreme Court wrote the figures down. In a Mumbai case decided in January 2022, a society’s flats had no OC for years. The judgment records what its members paid instead.

Property tax, no OC25% moreThan the normal rate, in the Samruddhi case
Water charges, no OC50% moreThan the normal charge, in the same case

The court held that a builder who skips the OC has failed the buyer. They can be made to pay for it. The case is called Samruddhi. The name is worth keeping, because it is the thing you quote when a builder shrugs.

Beyond the bills, five ordinary things get harder:

  • Water and power You stay on a temporary line, often one shared meter for the whole block.
  • Your tax bill You’re taxed because you live there. Paying it doesn’t make the building legal.
  • Your buyer’s loan Lenders ask for the OC on a ready or resale flat. No OC, no loan, so no buyer. Buying resale? Then it’s your own loan.
  • Your society The hand-over stalls, so nobody clearly owns the lift, the pump or the roof.
  • A notice NMMC, Navi Mumbai’s municipal corporation, has named 2,111 buildings here that are lived in without an OC, and warned every one of them.

And this isn’t only a Navi Mumbai worry. In Nagpur, about 88% of the city’s buildings are recorded as having no OC at all.

Want a rough figure for your own home? From that one case, take your last water bill and add about half. Take the tax bill and add about a quarter. No court has fixed those shares for your home. Treat it as a guide, not a bill.

Who signs the OC in your own area

Whoever signed your CC will sign your OC too. Which office is that? Most pages skip the question, and the answer is already printed on your own paper.

Navi Mumbai is split between four offices, by area:

Which office is in charge is genuinely mixed here, so please don’t guess. Read the letterhead on the CC, then call that office. The CC and the OC may name two different offices. If so, ask why before you pay.

Five checks you can finish this week

  1. Ask in writing One email: please send the OC, or the part OC covering my wing. Keep the reply, whatever it says.
  2. Read the paper, not the cover note A real OC sits on the authority’s letterhead, with an outward number and a date. Below that comes a schedule of the floors it clears. Does it name your wing and your floor? A part OC may cover a tower that isn’t yours.
  3. Open the project on the register MahaRERA (the state’s own register of approved projects) lists each project’s uploaded papers. Search the project on MahaRERA’s site and look for the OC there.
  4. Call the office on the letterhead Ask its town planning desk to confirm the number and the date on your copy.
  5. Hold the last slice Tell your builder, politely and in writing, that the final payment follows the OC. Then ask your own bank what it needs before the last instalment. A bank may release against a possession letter alone. That is the bank’s rule, not proof the building is legal.

If step 3 is new to you, we wrote the long version of it: how to check a project’s MahaRERA registration yourself, screen by screen.

Buying a new flat? Then ask for all of these together, once, rather than one at a time over six months.

Paper to collectWhat it proves
Agreement for sale, registeredYour price, your carpet area and your handover date, in law
Registration receipt, and Index II (the registrar’s own summary of the deal)The agreement is on the state’s record
MahaRERA registration certificateThe project is on the state register, with its own dates
Commencement certificate (CC)Building was allowed, and up to how many floors
Sanctioned planYour flat matches what the office approved
Building completion certificateThe architect’s word that the build matches the sanctioned plan
Occupancy certificate, full or partThe building is legal to live in
Payment schedule and receiptsWhat you’ve paid, and what is still due

Costs sit outside this list. Stamp duty (the state’s tax on a property sale) and the registration fee are a separate bill, and we worked both out rupee by rupee on a real Navi Mumbai flat.

A number proves a project is registered. It doesn’t prove the building is legal. Our own work rests on that register, so I’d rather say it than let you find out later.

In Kalyan and Dombivli, 65 buildings went up on forged approvals. Their builders held proper-looking certificates all the same. A certificate in a brochure is not the same as a certificate on an office’s own file.

About 6,500 residents were living in those buildings when the Bombay High Court ordered them demolished. The first police cases had been filed years earlier. That is the part worth knowing: trouble surfaces long after the money is paid.

The regulator tightened its grip after that. MahaRERA Order 45/2023, dated 15 May 2023, makes it compare the CC a builder files against the copy the planning office sends in directly. Old files are being re-read too. Letters went out asking offices to verify the OCs of 3,699 projects whose registration had run its course.

Nearly half of those letters came to our own region, 1,819 of them. So if you feel awkward asking your builder for a paper, please don’t. The state is asking that very same question of the very same files.

“OC applied for” is not an OC. Neither is a possession letter, a photo of the keys, or a line in the society group. Ask for the certificate’s number and date, then check both with the office that signed it.

Green lights, and the lines that mean stop

Release the last payment

  • A full OC that names your wing, with a number and a date
  • The office on the OC matches the office on the CC
  • The sanctioned plan matches the flat you walked through
  • Your agreement is registered, and the receipts tally

Stop and ask first

  • “OC applied for”, or a promise made only on a call
  • A part OC for a different wing, or for lower floors
  • A CC for fewer floors than the builder is selling
  • Nobody will put the OC number into an email

Which column is your own flat sitting in today? If it’s the right-hand one, you still have time, because the money hasn’t moved.

Then comes the pressure, and you will feel it. The office may say the slot closes, or that the price moves, or that another family is waiting. Pay on the schedule your own agreement sets, and no faster. Asking to see a paper is not a reason to lose anything.

And if they’ve already handed you the keys with no OC? Don’t shout, and don’t sign a clean receipt either. Write down that you’re taking the flat without the OC, ask for the date they expect it, and keep their reply. That letter is what a complaint later stands on.

The rule I’d give my own family: no OC, no last payment and no shifting date. Ask for it by name in writing, then confirm it with the office whose letterhead is on the CC.

What we can’t tell you

We hold no OC for a single one of the 463 projects on this site. What we do hold, for every one, is a register number, a builder’s name and a recorded handover month. That’s the first limit, and it’s about us.

That’s not carelessness, it’s the calendar. Every one of them is still being built. An OC only exists at the end of a build. So when we say a project is MahaRERA-checked, we mean exactly that. We have read its registration on the state’s own site. We don’t claim to have read a paper that doesn’t exist yet.

Your own OC question already has a date on it. The handover month on a project’s page is the month the builder gave the state. Two of ours sit at opposite ends of that line.

Innovative Crystal, KhargharDec 2027Recorded handover, so nothing to ask for yet
Sai Kaveesha, TalojaJun 2023Recorded handover, so ask for the OC today

A month that has already gone past is your cue to ask. Ask for the OC by name, in writing. Then read the register for an extension before you judge anyone.

One more limit, and this one is about the law: this is a guide, not legal advice. Your own agreement has its own words about payment and hand-over. Before you hold money back, show those words to a lawyer.

How we checked: every legal point above links to the Act, the state’s rules, the Supreme Court or MahaRERA. The handover months and the count are our own register entries, read on 29 October 2026. The share of those MahaRERA letters adds the five other regions together.

And if you’re holding a builder’s letter you can’t read, send it over. Our advisor will go through the papers with you and name the one that’s missing. The short form on this page reaches them. Let’s get your OC in writing before the furniture moves.

Questions buyers ask

Is CC the commencement certificate or the completion certificate?

In Maharashtra, the CC in your own file is almost always the commencement certificate. Plenty of national pages use CC for the completion certificate instead, which is why two articles can seem to contradict each other. Read the title printed on your own paper and trust that.

Can a flat be registered without an OC?

Registration and the OC come from two different offices. A sale can be registered while the OC is still pending. So your registration receipt says nothing about whether the building is legal to live in.

What if our builder never gets the OC?

Then they’ve failed you in law, and the Supreme Court has said so plainly. You can complain to the regulator under Section 11(4)(b). A formed society can also claim back the extra tax and water charges it has paid.

We already live in a building with no OC. What now?

You’re in a large group. Press your society to apply, ask your builder in writing, and keep every reply. A state plan to let societies apply for the OC themselves was reported in January 2026, though the full order wasn’t out at the time.

Does a part OC mean we can move in?

Only if it covers your wing and your floor. Read the schedule attached to it, not the covering letter. A part OC for Tower A does nothing at all for a flat in Tower B.

Buying your first home here? Our six steps to buying a flat in Navi Mumbai put this in order, from the loan to the keys.

Ask Raj about Kharghar

A shortlist that fits your budget and date, on WhatsApp. No calls unless you ask.

Add email

WhatsApp first, one call · Number never sold · Privacy policy

What we can't tell you, sources and corrections

This isn't legal advice, and it isn't a substitute for your own advocate reading the papers. Rules and rates change: check the source's date.

Sources

  1. Section 19 of the Real Estate (Regulation and Development) Act 2016, rights and duties of allottees: Section 19(10) requires every allottee to take physical possession within two months of the occupancy certificate being issued, and Section 19(11) requires the allottee to participate in registration of the conveyance deed under Section 17(1). Cited in this post only for the Section 19 claims; Section 11(4)(b) is cited to source 16, which carries that clause. www.aaptaxlaw.com, checked 28 Oct 2026.
  2. MahaRERA Order No. 45/2023 dated 15 May 2023, on verification of commencement certificates and occupation certificates: under a Government of Maharashtra resolution dated 23 February 2023, planning authorities forward commencement and occupation certificates to a designated MahaRERA email, and a promoter's filed certificate is compared with the authority's own copy for authenticity before the registration application proceeds, until the authorities' websites are integrated with MahaRERA's. taxguru.in, checked 28 Oct 2026.
  3. UDCPR 2020 (Unified Development Control and Promotion Regulations for Maharashtra) rules for completion, occupancy and part occupancy: Rule 2.9 the owner's architect or licensed engineer furnishes a building completion certificate in Appendix G; Rule 2.10 the authority issues the occupancy certificate within 21 days of receiving that completion certificate, failing which the work is deemed approved for occupation, and a deemed occupancy certificate is issued within 15 days of application; Rule 2.11 a part occupancy certificate may be issued before the whole work is complete. eastonassociate.com, checked 28 Oct 2026.
  4. Free Press Journal, 25 June 2025: NMMC lists 2,111 buildings and housing societies occupied without an occupancy certificate and warns of action, after a Bombay High Court directive dated 25 October 2024 asking the corporation for details of non-compliant structures. The list is published on nmmc.gov.in and displayed at all eight ward offices, residents are urged to apply to the Town Planning Department, and failure may attract penal action under the Maharashtra Regional and Town Planning Act 1966. www.freepressjournal.in, checked 28 Oct 2026.
  5. The Realty Today: MahaRERA orders a 10-day verification of occupation certificates for 3,699 lapsed projects, after complaints of forged construction approvals including in Kalyan-Dombivali. The regional split is Mumbai Metropolitan Region 1,819, Pune 1,223, Nashik 273, Nagpur 168, Chhatrapati Sambhajinagar 132 and Amravati 84; if a planning authority does not reply within 10 days the certificates are assumed genuine and that authority is accountable for later discrepancies. therealtytoday.com, checked 28 Oct 2026.
  6. Real Estate Law Journal, 22 February 2025: the KDMC case, in which 65 builders obtained MahaRERA certificates using fake and fabricated documents without official building permissions. Demolition of the 65 buildings was ordered on 19 November 2024, around 6,500 residents faced eviction, the Bombay High Court's three-month window to find alternative housing expired on 3 February 2025, and two FIRs were registered at Dombivli and Manpada police stations on 27 September 2022 and 3 October 2022. realestatelawjournal.in, checked 28 Oct 2026.
  7. Samruddhi Co-operative Housing Society Ltd v Mumbai Mahalaxmi Construction Pvt Ltd, Supreme Court of India, judgment dated 11 January 2022 (2022 LiveLaw SC 36), full text: flats booked in 1993 and possession given in 1997 with no occupation certificate; members were ineligible for individual electricity and water connections, paid property tax at a rate 25% higher than normal and water charges 50% higher; the promoter's failure to obtain the occupation certificate is a deficiency of service under consumer law and a continuing wrong, and the Maharashtra Ownership Flats Act 1963 obliges the promoter to obtain it before handing over possession. www.livelaw.in, checked 28 Oct 2026.
  8. All About Nagpur, 18 August 2026: 3,243 of Nagpur's 3,669 buildings, about 88%, have no occupancy certificate; cites Section 11(4)(b) of the RERA Act 2016 as the promoter's duty, and reports that at a meeting on 9 August 2026 officials said developers without an OC should not be permitted to register. Read as scale evidence for how common a missing OC is in Maharashtra, not as a published state rule. www.allaboutnagpur.in, checked 28 Oct 2026.
  9. Occupancy certificate and completion certificate, an India guide: the occupancy certificate is required by lenders before sanctioning against a completed or resale property, a buyer of a resale flat in a building without an OC will struggle to find a financed buyer later, and occupying without an OC is irregular under Maharashtra building regulations with MCGM and NMMC both stepping up enforcement. assetlyhq.com, checked 28 Oct 2026.
  10. PropNewz, 4 September 2026, occupancy certificate against commencement certificate for a Mumbai buyer: the commencement certificate is municipal permission to start construction and the occupancy certificate is municipal permission to move in, with the completion certificate bridging the two; a developer's possession letter alone does not make occupation lawful; and the recommended buyer checks are to request the OC in writing, confirm it covers the specific tower and floor, cross-check with the issuing corporation, compare the approved plan with what was built, read the RERA project page documents, and make the final payment conditional on a valid OC. www.propnewz.com, checked 28 Oct 2026.
  11. MahaRERA's own Search Project page, where a visitor filters registered projects by state, district, project type, carpet area and completion percentage, and opens a project's page to read its registration number, promoter and uploaded documents. maharera.maharashtra.gov.in, checked 28 Oct 2026.
  12. Navi Mumbai Municipal Corporation's official site, which carries its online services including the occupancy certificate application, new water connection and property tax, and which published the list of buildings occupied without an occupancy certificate. www.nmmc.gov.in, checked 28 Oct 2026.
  13. India Law, 5 January 2026, on Maharashtra's new occupancy certificate reform: housing societies would be allowed to apply for a full or part occupancy certificate themselves where the developer has not, jointly or alone, with no penalty on applications made within six months though a premium applies where extra FSI was used; the article states the comprehensive Government Resolution was still pending at the time of writing, and that significant unauthorised construction or safety failures can still be rejected. www.indialaw.in, checked 28 Oct 2026.
  14. Our own project records, read on 29 October 2026: 463 projects across Navi Mumbai, each carrying its MahaRERA registration number, developer name, configurations and registered handover month. The records hold no occupancy certificate and no commencement certificate for any project, which is the honest limit the post states; the recorded handover months quoted for Innovative Crystal (Kharghar, 2027-12) and Sai Kaveesha (Taloja, 2023-06) come from these records. 10projects.ai, checked 29 Oct 2026.
  15. Kalpataru, "What is CC in real estate? Full form, meaning and importance": a national developer page that uses CC to mean the completion certificate, defining it as an official legal document issued by municipal corporations or local development authorities after verification of the completed construction, and treating the commencement certificate as a separate document needed in order to obtain the CC. Cited as evidence of the national usage that conflicts with the Maharashtra usage, which is the confusion the post resolves. www.kalpataru.com, checked 28 Oct 2026.
  16. Section 11 of the Real Estate (Regulation and Development) Act 2016 on Indian Kanoon, full statutory text. Clause (4)(b) reads: "be responsible to obtain the completion certificate or the occupancy certificate, or both, as applicable, from the relevant competent authority as per local laws or other laws for the time being in force and to make it available to the allottees individually or to the association of allottees, as the case may be". indiankanoon.org, checked 28 Oct 2026.
  17. Section 17 of the Real Estate (Regulation and Development) Act 2016, transfer of title, on Indian Kanoon: the promoter executes a registered conveyance deed and hands over physical possession; title passes within the period set by local law, and in the absence of any local law within three months from the date of issue of the occupancy certificate; the promoter must also hand over the necessary documents and plans within thirty days of obtaining the occupancy certificate where no local law applies. indiankanoon.org, checked 28 Oct 2026.

Corrections

None yet. Spotted something wrong? Tell your advisor and we will fix it and note it here.

Read next

Choose a city or area

    Talk to an advisor

    Add email

    WhatsApp first, one call · Number never sold · Privacy policy

    Your shortlist

    Saved · view shortlist
    Hi! I'm Pooja. Looking at Kharghar?